top of page
Fauststoß

The Team is the Key to Success

INVEST_Logo_URL_rote_URL_RZ.png

About Us

FirstHSystems was founded in 2023. Since then we have been working flat out on the final design of our prototype with an output of 1 MW(+) in a modular design. Building-integrated electrolysis systems with a capacity of up to 100 MW are being planned.

FirstH2 Systems bundles in its founding team a high level of core competence in the field of high-vacuum thin-film technology, of plant engineering and automation - essential prerequisites for the development of innovative catalyst layers for PEM electrolysis.

bottom of page